{"id":36199,"date":"2026-07-14T12:48:08","date_gmt":"2026-07-14T16:48:08","guid":{"rendered":"https:\/\/stage.buildxact.com\/us\/?p=36199"},"modified":"2026-07-14T12:48:08","modified_gmt":"2026-07-14T16:48:08","slug":"lien-waivers-in-construction-types-templates-and-best-practices","status":"publish","type":"post","link":"https:\/\/stage.buildxact.com\/us\/article\/lien-waivers-in-construction-types-templates-and-best-practices\/","title":{"rendered":"Lien Waivers in Construction: Types, Templates, and Best Practices"},"content":{"rendered":"\n<p>If you\u2019ve been in construction for any length of time, you\u2019ve dealt with lien waivers. Maybe someone handed you one before cutting a check, or a general contractor held up payment until you signed. Either way, most builders handle them without really understanding what they\u2019re agreeing to, and that\u2019s where things go wrong.<\/p>\n\n\n\n<p>This guide breaks it all down: what lien waivers are, the 4 types you\u2019ll encounter, when to use each, and how to build a clean process that keeps payments moving and protects everyone on the job.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">What Is a Lien Waiver in Construction?<\/h2>\n\n\n\n<p>A lien is a legal claim for unpaid work. In construction, it\u2019s what you use if you\u2019ve done the work and haven\u2019t been paid. You\u2019re basically saying, \u201cI\u2019m owed money, and I\u2019m placing a claim on this property until I get it.\u201d That claim makes it hard for the property owner to sell or refinance, putting pressure on them to resolve the payment issue.<\/p>\n\n\n\n<p>A lien waiver is the opposite of that.<\/p>\n\n\n\n<p>It\u2019s a document you sign when payment is made that says, \u201cI\u2019ve been paid (or I\u2019m about to be), so I won\u2019t file a lien for this amount.\u201d<\/p>\n\n\n\n<p>Think of it like a receipt with legal weight. You\u2019re confirming the payment and giving up your right to chase that same money later through a lien.<\/p>\n\n\n\n<figure data-wp-context=\"{&quot;imageId&quot;:&quot;6a581eca02cc4&quot;}\" data-wp-interactive=\"core\/image\" data-wp-key=\"6a581eca02cc4\" class=\"wp-block-image size-large wp-lightbox-container\"><img decoding=\"async\" data-wp-class--hide=\"state.isContentHidden\" data-wp-class--show=\"state.isContentVisible\" data-wp-init=\"callbacks.setButtonStyles\" data-wp-on--click=\"actions.showLightbox\" data-wp-on--load=\"callbacks.setButtonStyles\" data-wp-on-window--resize=\"callbacks.setButtonStyles\" src=\"https:\/\/cdn.mediavalet.com\/usca\/buildxact\/_vYDebIrF0SHF2-_8ifxqg\/J8E1xoRJhEOfldHMuIWhlg\/Large\/Construction%20Lien%20Waiver%20Process.jpeg?f=auto\" alt=\"\"\/><button\n\t\t\tclass=\"lightbox-trigger\"\n\t\t\ttype=\"button\"\n\t\t\taria-haspopup=\"dialog\"\n\t\t\taria-label=\"Enlarge\"\n\t\t\tdata-wp-init=\"callbacks.initTriggerButton\"\n\t\t\tdata-wp-on--click=\"actions.showLightbox\"\n\t\t\tdata-wp-style--right=\"state.imageButtonRight\"\n\t\t\tdata-wp-style--top=\"state.imageButtonTop\"\n\t\t>\n\t\t\t<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"12\" height=\"12\" fill=\"none\" viewBox=\"0 0 12 12\">\n\t\t\t\t<path fill=\"#fff\" d=\"M2 0a2 2 0 0 0-2 2v2h1.5V2a.5.5 0 0 1 .5-.5h2V0H2Zm2 10.5H2a.5.5 0 0 1-.5-.5V8H0v2a2 2 0 0 0 2 2h2v-1.5ZM8 12v-1.5h2a.5.5 0 0 0 .5-.5V8H12v2a2 2 0 0 1-2 2H8Zm2-12a2 2 0 0 1 2 2v2h-1.5V2a.5.5 0 0 0-.5-.5H8V0h2Z\" \/>\n\t\t\t<\/svg>\n\t\t<\/button><\/figure>\n\n\n\n<div style=\"height:39px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p>On a real job, this just becomes part of how payments flow.&nbsp;<a href=\"https:\/\/www.buildxact.com\/us\/features\/construction-invoicing-software\/\">You send an invoice<\/a>, the funds come through, and then you sign a lien waiver for that amount. The job continues, and the same thing happens again at the next stage. By the time you reach the final payment, everything will have been properly signed off.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Why Lien Waivers Matter on Residential Builds<\/h2>\n\n\n\n<p>Lien waivers protect everyone involved in a residential project, not just the builder collecting payment.<\/p>\n\n\n\n<p>For property owners, they reduce the risk of paying twice for the same work. Without a signed waiver, there\u2019s always a chance a contractor, subcontractor, or dealer could still file a lien later, even after money has already changed hands.<\/p>\n\n\n\n<p>For general contractors, lien waivers make it safer to release payments throughout the job. You know the right paperwork is attached to the payment, and you have proof that the work tied to that invoice has been properly signed off.<\/p>\n\n\n\n<p>For subcontractors and dealers, waivers help create a clear payment process. Instead of chasing money or arguing over what\u2019s outstanding, everyone knows what\u2019s been invoiced, what\u2019s been paid, and what rights are being waived.<\/p>\n\n\n\n<p>Most importantly, lien waivers keep construction projects moving.<\/p>\n\n\n\n<p>Many residential builds rely on staged payments. If a waiver is missing, payment usually gets held up. Once payment is delayed, there\u2019s a ripple effect on the project. Subcontractors don\u2019t get paid, materials get delayed, and suddenly a straightforward job becomes stressful.<\/p>\n\n\n\n<p>They also make it much easier to track what\u2019s been paid and what\u2019s still outstanding. When payments are tied to the right paperwork, it becomes much easier to track costs, manage cash flow, and see how each job is performing against budget.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Lien Waiver vs. Mechanics Lien vs. Lien Release<\/h2>\n\n\n\n<p>These three terms sound similar, but they happen at completely different stages of the payment process.<\/p>\n\n\n\n<figure data-wp-context=\"{&quot;imageId&quot;:&quot;6a581eca0323f&quot;}\" data-wp-interactive=\"core\/image\" data-wp-key=\"6a581eca0323f\" class=\"wp-block-image size-large wp-lightbox-container\"><img decoding=\"async\" data-wp-class--hide=\"state.isContentHidden\" data-wp-class--show=\"state.isContentVisible\" data-wp-init=\"callbacks.setButtonStyles\" data-wp-on--click=\"actions.showLightbox\" data-wp-on--load=\"callbacks.setButtonStyles\" data-wp-on-window--resize=\"callbacks.setButtonStyles\" src=\"https:\/\/cdn.mediavalet.com\/usca\/buildxact\/HNfHrSM1rkWJreTs5RKExg\/oaonFzPy-ESA4AmzhsDPdg\/Large\/Lien%20Waiver%20vs.%20Mechanics%20Lien%20vs.%20Lien%20Release.jpeg?f=auto\" alt=\"\"\/><button\n\t\t\tclass=\"lightbox-trigger\"\n\t\t\ttype=\"button\"\n\t\t\taria-haspopup=\"dialog\"\n\t\t\taria-label=\"Enlarge\"\n\t\t\tdata-wp-init=\"callbacks.initTriggerButton\"\n\t\t\tdata-wp-on--click=\"actions.showLightbox\"\n\t\t\tdata-wp-style--right=\"state.imageButtonRight\"\n\t\t\tdata-wp-style--top=\"state.imageButtonTop\"\n\t\t>\n\t\t\t<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"12\" height=\"12\" fill=\"none\" viewBox=\"0 0 12 12\">\n\t\t\t\t<path fill=\"#fff\" d=\"M2 0a2 2 0 0 0-2 2v2h1.5V2a.5.5 0 0 1 .5-.5h2V0H2Zm2 10.5H2a.5.5 0 0 1-.5-.5V8H0v2a2 2 0 0 0 2 2h2v-1.5ZM8 12v-1.5h2a.5.5 0 0 0 .5-.5V8H12v2a2 2 0 0 1-2 2H8Zm2-12a2 2 0 0 1 2 2v2h-1.5V2a.5.5 0 0 0-.5-.5H8V0h2Z\" \/>\n\t\t\t<\/svg>\n\t\t<\/button><\/figure>\n\n\n\n<div style=\"height:39px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p><strong>A<\/strong>&nbsp;<strong>mechanics lien<\/strong>&nbsp;is what gets filed when payment problems haven\u2019t been resolved. It\u2019s the legal claim used to recover unpaid money tied to a project.<\/p>\n\n\n\n<p><strong>A lien waiver<\/strong>&nbsp;is used before things reach that point. It\u2019s signed during the payment process to confirm that lien rights are being waived for a specific payment amount.<\/p>\n\n\n\n<p><strong>A lien release<\/strong>&nbsp;only comes into play after a lien has already been filed. Once payment is sorted, the release removes that claim from the property.<\/p>\n\n\n\n<p>A simple way to separate them:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>A waiver helps prevent a lien<\/li>\n\n\n\n<li>A lien is what happens when payment breaks down<\/li>\n\n\n\n<li>A release clears the lien after the issue is resolved<\/li>\n<\/ul>\n\n\n\n<p>Ideally, residential projects stay in the waiver stage and never reach the lien stage.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">The 4 Types of Lien Waivers<\/h2>\n\n\n\n<p>There are four standard lien waivers used in construction, each serving a different purpose depending on where you are in the payment process.<\/p>\n\n\n\n<figure data-wp-context=\"{&quot;imageId&quot;:&quot;6a581eca036b5&quot;}\" data-wp-interactive=\"core\/image\" data-wp-key=\"6a581eca036b5\" class=\"wp-block-image size-large wp-lightbox-container\"><img decoding=\"async\" data-wp-class--hide=\"state.isContentHidden\" data-wp-class--show=\"state.isContentVisible\" data-wp-init=\"callbacks.setButtonStyles\" data-wp-on--click=\"actions.showLightbox\" data-wp-on--load=\"callbacks.setButtonStyles\" data-wp-on-window--resize=\"callbacks.setButtonStyles\" src=\"https:\/\/cdn.mediavalet.com\/usca\/buildxact\/jpZgOYE8nE6Y0y_vUdNJoQ\/BVxOIvTPWUGiFhsQynQHHw\/Large\/The%204%20Types%20of%20Lien%20Waivers.jpeg?f=auto\" alt=\"\"\/><button\n\t\t\tclass=\"lightbox-trigger\"\n\t\t\ttype=\"button\"\n\t\t\taria-haspopup=\"dialog\"\n\t\t\taria-label=\"Enlarge\"\n\t\t\tdata-wp-init=\"callbacks.initTriggerButton\"\n\t\t\tdata-wp-on--click=\"actions.showLightbox\"\n\t\t\tdata-wp-style--right=\"state.imageButtonRight\"\n\t\t\tdata-wp-style--top=\"state.imageButtonTop\"\n\t\t>\n\t\t\t<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"12\" height=\"12\" fill=\"none\" viewBox=\"0 0 12 12\">\n\t\t\t\t<path fill=\"#fff\" d=\"M2 0a2 2 0 0 0-2 2v2h1.5V2a.5.5 0 0 1 .5-.5h2V0H2Zm2 10.5H2a.5.5 0 0 1-.5-.5V8H0v2a2 2 0 0 0 2 2h2v-1.5ZM8 12v-1.5h2a.5.5 0 0 0 .5-.5V8H12v2a2 2 0 0 1-2 2H8Zm2-12a2 2 0 0 1 2 2v2h-1.5V2a.5.5 0 0 0-.5-.5H8V0h2Z\" \/>\n\t\t\t<\/svg>\n\t\t<\/button><\/figure>\n\n\n\n<div style=\"height:39px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h3 class=\"wp-block-heading\">Conditional waiver on progress payment<\/h3>\n\n\n\n<p>This type of lien waiver is used during the job when a partial payment has been promised, but the funds haven\u2019t cleared yet. You\u2019re agreeing to waive lien rights for that portion of the work only once you\u2019ve received payment. Until then, your protection stays in place.<\/p>\n\n\n\n<p>For builders and subcontractors, this is usually the safer option when waiting on a progress payment to come through.<\/p>\n\n\n\n<p><em>&gt;&gt; <a href=\"https:\/\/cdn.mediavalet.com\/usca\/buildxact\/ms1KEkoBp0GS970XUwqrJA\/mPO5QeR9_0mfpwLfm-7iGw\/Original\/Buildxact%20-%20conditional%20progress%20lien%20waiver%20template.docx\">Download conditional progress lien waiver template<\/a><\/em><\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Unconditional waiver on progress payment<\/h3>\n\n\n\n<p>Once the progress payment has been processed, this waiver releases lien rights for the work completed to date, no strings attached.<\/p>\n\n\n\n<p>Once you sign it, those rights are gone for that payment amount. Because of that, you should only use this waiver after confirming the funds have been received.<\/p>\n\n\n\n<p><em>&gt;&gt; <a href=\"https:\/\/cdn.mediavalet.com\/usca\/buildxact\/FOqkfRXQ80qZm_wDNrKPkQ\/HQXfMbqV_E2GwzFOpTknuw\/Original\/Buildxact%20-%20unconditional%20progress%20lien%20waiver%20template.docx\">Download unconditional progress lien waiver template<\/a><\/em><\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Conditional waiver on final payment<\/h3>\n\n\n\n<p>This waiver is used at the end of the project, when the final payment is expected but hasn\u2019t yet gone through. It waives all remaining lien rights on the job, but only upon receipt of the final funds. Until then, your lien protection stays in place.<\/p>\n\n\n\n<p>For many builders, this is the safer option while waiting for the final check to process.<\/p>\n\n\n\n<p><em>&gt;&gt; <a href=\"https:\/\/cdn.mediavalet.com\/usca\/buildxact\/f6YUQfU6v0ic2Wy_n1fvVw\/-N1TAIUotUOqAQTmSAOGHw\/Original\/Buildxact%20-%20conditional%20final%20lien%20waiver%20template.docx\">Download conditional final lien waiver template<\/a><\/em><\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Unconditional waiver on final payment<\/h3>\n\n\n\n<p>This is the final sign-off on the project. Once you sign it, all remaining lien rights tied to the job are permanently gone. There\u2019s no reversing it afterward.<\/p>\n\n\n\n<p>You should only sign this waiver once every dollar owed has fully cleared and is sitting in your account.<\/p>\n\n\n\n<p><em>&gt;&gt; <a href=\"https:\/\/cdn.mediavalet.com\/usca\/buildxact\/tsN8WLast0SvXU0P0F9WEQ\/mPz0SekfEkOaq9jbkzrbTA\/Original\/Buildxact%20-%20unconditional%20final%20lien%20waiver%20template.docx\">Download unconditional final lien waiver template<\/a><\/em><\/p>\n\n\n\n<h2 class=\"wp-block-heading\">How to Choose the Right Lien Waiver<\/h2>\n\n\n\n<p>Choosing the right lien waiver comes down to two things:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Has the payment cleared yet?<\/li>\n\n\n\n<li>Is it a progress payment or the final payment?<\/li>\n<\/ul>\n\n\n\n<figure data-wp-context=\"{&quot;imageId&quot;:&quot;6a581eca03da9&quot;}\" data-wp-interactive=\"core\/image\" data-wp-key=\"6a581eca03da9\" class=\"wp-block-image size-large wp-lightbox-container\"><img decoding=\"async\" data-wp-class--hide=\"state.isContentHidden\" data-wp-class--show=\"state.isContentVisible\" data-wp-init=\"callbacks.setButtonStyles\" data-wp-on--click=\"actions.showLightbox\" data-wp-on--load=\"callbacks.setButtonStyles\" data-wp-on-window--resize=\"callbacks.setButtonStyles\" src=\"https:\/\/cdn.mediavalet.com\/usca\/buildxact\/6eDieJzN9UqO0vT1JPhuPQ\/pKgs_0zkOkOHan5_vEjoKw\/Large\/How%20to%20Choose%20the%20Right%20Lien%20Waiver.jpeg?f=auto\" alt=\"\"\/><button\n\t\t\tclass=\"lightbox-trigger\"\n\t\t\ttype=\"button\"\n\t\t\taria-haspopup=\"dialog\"\n\t\t\taria-label=\"Enlarge\"\n\t\t\tdata-wp-init=\"callbacks.initTriggerButton\"\n\t\t\tdata-wp-on--click=\"actions.showLightbox\"\n\t\t\tdata-wp-style--right=\"state.imageButtonRight\"\n\t\t\tdata-wp-style--top=\"state.imageButtonTop\"\n\t\t>\n\t\t\t<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"12\" height=\"12\" fill=\"none\" viewBox=\"0 0 12 12\">\n\t\t\t\t<path fill=\"#fff\" d=\"M2 0a2 2 0 0 0-2 2v2h1.5V2a.5.5 0 0 1 .5-.5h2V0H2Zm2 10.5H2a.5.5 0 0 1-.5-.5V8H0v2a2 2 0 0 0 2 2h2v-1.5ZM8 12v-1.5h2a.5.5 0 0 0 .5-.5V8H12v2a2 2 0 0 1-2 2H8Zm2-12a2 2 0 0 1 2 2v2h-1.5V2a.5.5 0 0 0-.5-.5H8V0h2Z\" \/>\n\t\t\t<\/svg>\n\t\t<\/button><\/figure>\n\n\n\n<div style=\"height:39px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p>If the money is still pending, you\u2019ll generally want a conditional waiver. That keeps your lien rights protected until the payment actually arrives. If the payment has already cleared, you can use an unconditional waiver instead.<\/p>\n\n\n\n<p>The next thing to look at is where you are in the project.<\/p>\n\n\n\n<p>If you\u2019re somewhere in the middle of the job and dealing with a staged payment, you\u2019ll use a progress waiver. If you\u2019re wrapping up the project and receiving the last payment, you\u2019ll use a final waiver.<\/p>\n\n\n\n<p>Most waiver mistakes happen when builders sign paperwork too quickly without checking those two things first. Before signing anything, confirm the funds have cleared and double-check you\u2019re using the correct waiver for that&nbsp;<a href=\"https:\/\/www.buildxact.com\/us\/blog\/stages-in-construction-project-management\/\">stage of the construction project<\/a>.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">What Happens if You Use the Wrong Lien Waiver?<\/h2>\n\n\n\n<p>Using the wrong waiver can put your payment rights at risk.<\/p>\n\n\n\n<p>The biggest mistake is signing an unconditional waiver before the payment has actually cleared. Once you sign it, you may lose your right to file a lien for that amount, even if the money never arrives.<\/p>\n\n\n\n<p>The wrong waiver can also create confusion around what\u2019s actually been paid. For example, using a final waiver too early can make it appear the entire project has been settled when there are still outstanding payments on the job.<\/p>\n\n\n\n<p>Missing waivers can also cause problems. Many residential jobs won\u2019t release funds until the correct waiver has been submitted. If paperwork is missing, payments are delayed, subcontractors start waiting for money, and the project can quickly fall behind&nbsp;<a href=\"https:\/\/www.buildxact.com\/us\/blog\/construction-scheduling\/\">schedule<\/a>.<\/p>\n\n\n\n<p>Then there\u2019s the admin side. Without a proper process, lien waivers end up scattered across emails, folders, and spreadsheets. That\u2019s often when paperwork gets missed or signed at the wrong time.<\/p>\n\n\n\n<p>On bigger projects with multiple invoices, subcontractors, and staged payments, even small waiver mistakes can create real cash flow pressure. That\u2019s why keeping waivers tied to invoices, payments, and job tracking matters so much.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">State-Specific Lien Waiver Rules<\/h2>\n\n\n\n<p>Lien waiver rules vary from state to state, so it\u2019s important to use the right form for the project and location you\u2019re working in.<\/p>\n\n\n\n<figure data-wp-context=\"{&quot;imageId&quot;:&quot;6a581eca0429b&quot;}\" data-wp-interactive=\"core\/image\" data-wp-key=\"6a581eca0429b\" class=\"wp-block-image size-large wp-lightbox-container\"><img decoding=\"async\" data-wp-class--hide=\"state.isContentHidden\" data-wp-class--show=\"state.isContentVisible\" data-wp-init=\"callbacks.setButtonStyles\" data-wp-on--click=\"actions.showLightbox\" data-wp-on--load=\"callbacks.setButtonStyles\" data-wp-on-window--resize=\"callbacks.setButtonStyles\" src=\"https:\/\/cdn.mediavalet.com\/usca\/buildxact\/21K8knbFR0KvtnjMt7iPCw\/lRdB05QmbUyjCTe4F5KwyA\/Large\/Lien%20Waiver%20Laws_%20Strict%20vs%20Flexible%20States.jpeg?f=auto\" alt=\"\"\/><button\n\t\t\tclass=\"lightbox-trigger\"\n\t\t\ttype=\"button\"\n\t\t\taria-haspopup=\"dialog\"\n\t\t\taria-label=\"Enlarge\"\n\t\t\tdata-wp-init=\"callbacks.initTriggerButton\"\n\t\t\tdata-wp-on--click=\"actions.showLightbox\"\n\t\t\tdata-wp-style--right=\"state.imageButtonRight\"\n\t\t\tdata-wp-style--top=\"state.imageButtonTop\"\n\t\t>\n\t\t\t<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"12\" height=\"12\" fill=\"none\" viewBox=\"0 0 12 12\">\n\t\t\t\t<path fill=\"#fff\" d=\"M2 0a2 2 0 0 0-2 2v2h1.5V2a.5.5 0 0 1 .5-.5h2V0H2Zm2 10.5H2a.5.5 0 0 1-.5-.5V8H0v2a2 2 0 0 0 2 2h2v-1.5ZM8 12v-1.5h2a.5.5 0 0 0 .5-.5V8H12v2a2 2 0 0 1-2 2H8Zm2-12a2 2 0 0 1 2 2v2h-1.5V2a.5.5 0 0 0-.5-.5H8V0h2Z\" \/>\n\t\t\t<\/svg>\n\t\t<\/button><\/figure>\n\n\n\n<div style=\"height:39px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p>Twelve states require strict, set forms with exact wording: Arizona, California, Florida, Georgia, Massachusetts, Michigan, Mississippi, Missouri, Nevada, Texas, Utah, and Wyoming.<\/p>\n\n\n\n<p>In these states, you can\u2019t edit the form. If you change anything, even slightly, the waiver can be rejected or unenforceable.&nbsp;<a href=\"https:\/\/www.cslb.ca.gov\/consumers\/legal_issues_for_consumers\/mechanics_lien\/conditional_and_unconditional_waiver_release_form.aspx\">California<\/a>&nbsp;is a well-known example of how strict this can be.<\/p>\n\n\n\n<p>The other 38 states are more flexible and allow custom lien waiver forms. That may sound easier, but it can create its own problems. If the wording is too broad, you could accidentally waive more rights than you intended.<\/p>\n\n\n\n<p>Some states also have extra requirements around notarization, payment timing, and when lien rights can legally be waived. For example, Mississippi and Wyoming require notarization for lien waivers, while Texas has removed that requirement for newer projects.<\/p>\n\n\n\n<p>The safest approach is to check your state rules before using a lien waiver template or signing anything. Getting this wrong can affect whether you get paid.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Managing Lien Waivers Across Invoices, Payments, and Job Tracking<\/h2>\n\n\n\n<p>Lien waivers work best when they\u2019re treated as part of your normal payment process, not as random paperwork floating around the job.<\/p>\n\n\n\n<p>The flow should stay connected from start to finish and follow the same path:<\/p>\n\n\n\n<p><a href=\"https:\/\/www.buildxact.com\/us\/features\/construction-estimating-software\/\"><strong><em>Estimate<\/em><\/strong><\/a><strong><em>, Invoice, Payment, Lien waiver, Next payment<\/em><\/strong><\/p>\n\n\n\n<p>Once those steps stop connecting properly, small issues quickly escalate. Payments get delayed, paperwork goes missing, and nobody is entirely sure what\u2019s been paid, what&#8217;s been signed off on, or what&#8217;s still outstanding.<\/p>\n\n\n\n<p>You shouldn\u2019t have to dig through emails or spreadsheets to figure out whether a payment cleared or whether a subcontractor already submitted their waiver. That\u2019s why connected systems and&nbsp;<a href=\"https:\/\/www.buildxact.com\/us\/\">construction management software like Buildxact<\/a>&nbsp;matter so much. With the right tools, your estimating, invoicing, purchase orders, payments, and job costing all work together in one place. You can track what\u2019s been invoiced, what\u2019s been paid, what\u2019s still outstanding, and how each job is performing financially in real time.<\/p>\n\n\n\n<figure data-wp-context=\"{&quot;imageId&quot;:&quot;6a581eca046db&quot;}\" data-wp-interactive=\"core\/image\" data-wp-key=\"6a581eca046db\" class=\"wp-block-image size-large wp-lightbox-container\"><img decoding=\"async\" data-wp-class--hide=\"state.isContentHidden\" data-wp-class--show=\"state.isContentVisible\" data-wp-init=\"callbacks.setButtonStyles\" data-wp-on--click=\"actions.showLightbox\" data-wp-on--load=\"callbacks.setButtonStyles\" data-wp-on-window--resize=\"callbacks.setButtonStyles\" src=\"https:\/\/cdn.mediavalet.com\/usca\/buildxact\/LGap5IfYFUihbjvIlKO_5w\/gE7K9RNSM0SLAXypuxeWzQ\/Large\/Buildxact%20Invoicing%20Features.jpeg?f=auto\" alt=\"\"\/><button\n\t\t\tclass=\"lightbox-trigger\"\n\t\t\ttype=\"button\"\n\t\t\taria-haspopup=\"dialog\"\n\t\t\taria-label=\"Enlarge\"\n\t\t\tdata-wp-init=\"callbacks.initTriggerButton\"\n\t\t\tdata-wp-on--click=\"actions.showLightbox\"\n\t\t\tdata-wp-style--right=\"state.imageButtonRight\"\n\t\t\tdata-wp-style--top=\"state.imageButtonTop\"\n\t\t>\n\t\t\t<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"12\" height=\"12\" fill=\"none\" viewBox=\"0 0 12 12\">\n\t\t\t\t<path fill=\"#fff\" d=\"M2 0a2 2 0 0 0-2 2v2h1.5V2a.5.5 0 0 1 .5-.5h2V0H2Zm2 10.5H2a.5.5 0 0 1-.5-.5V8H0v2a2 2 0 0 0 2 2h2v-1.5ZM8 12v-1.5h2a.5.5 0 0 0 .5-.5V8H12v2a2 2 0 0 1-2 2H8Zm2-12a2 2 0 0 1 2 2v2h-1.5V2a.5.5 0 0 0-.5-.5H8V0h2Z\" \/>\n\t\t\t<\/svg>\n\t\t<\/button><\/figure>\n\n\n\n<div style=\"height:39px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p>That visibility reduces much of the risk associated with lien waivers. Instead of feeling like stressful legal paperwork, they simply become another step in a payment process you already have under control.<\/p>\n\n\n\n<p>To see how Buildxact helps builders stay on top of invoicing, payments, and project financials,&nbsp;<a href=\"https:\/\/www.buildxact.com\/us\/schedule-a-demo\/\">schedule a demo with our team<\/a>&nbsp;or&nbsp;<a href=\"https:\/\/app.buildxact.com\/us\/signup.html?_gl=1*7dsl44*_gcl_aw*R0NMLjE3NzczMDM2MDUuQ2owS0NRandrcnpQQmhDcUFSSXNBSk40NjBsaEFkWFBlaWpVSkVtbWRwV2NsVlIzemhPMk94UU5TbTRmLUdtUUFqMm1wTjRvSWZqX3B4UWFBam01RUFMd193Y0I.*_gcl_au*MTc4NzkxMzE3Ni4xNzczMDQ4ODY2*_ga*MTY3NDM4NjQyMy4xNzcxNDM1Njcw*_ga_7JE2XW9RBL*czE3Nzk4MDQ3MDEkbzgwJGcwJHQxNzc5ODA0NzAyJGo1OSRsMCRoMTM0MTE2MjE5Mg..*_fplc*R2xuTmVDdUtjSUl2WjJNRGJ1VE5qRDBTRmlpWTZXQlgycFBCaThuekE5VDdnSDBOWVEzQU0lMkZtYkp3RTY1aGZKOHFlb0lKeWRNYk1GTmh6NXJGbmRHdVlsUHkyJTJGMkM3TmhNcjhPOGxPUURZQndJOGtzTGdOMVZ0cCUyQkJLeTFnJTNEJTNE\">sign up for free<\/a>.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">FAQs<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\">Do I have to sign a lien waiver to get paid?<\/h3>\n\n\n\n<p>In many cases, yes. Property owners and general contractors often require a lien waiver before releasing payment, especially on residential projects with staged progress payments.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Can I refuse to sign a lien waiver?<\/h3>\n\n\n\n<p>You can, but it may delay payment. Most builders, subcontractors, and dealers are expected to submit the correct waiver as part of the payment process.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">What\u2019s the biggest mistake to avoid?<\/h3>\n\n\n\n<p>Signing an unconditional waiver before the payment has actually cleared. Once it\u2019s signed, you may lose your right to file a lien for that amount even if the money never arrives.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Do lien waivers apply to dealers, too?<\/h3>\n\n\n\n<p>Yes. Material dealers can also file mechanics liens if they aren\u2019t paid, which is why dealers are often required to submit lien waivers before payments are released.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>If you\u2019ve been in construction for any length of time, you\u2019ve dealt with lien waivers. Maybe someone handed you one before cutting a check, or a general contractor held up payment until you signed. Either way, most builders handle them without really understanding what they\u2019re agreeing to, and that\u2019s where things go wrong.<\/p>\n<p>This guide breaks it all down: what lien waivers<\/p>\n<div style=\"display:none;\" class=\"postcatlist\"><a href='https:\/\/stage.buildxact.com\/us\/tag\/construction-advice\/'><span>Construction advice<\/span><\/a> <a href='https:\/\/stage.buildxact.com\/us\/tag\/industry-insights\/'><span>Industry insights<\/span><\/a> <a href='https:\/\/stage.buildxact.com\/us\/tag\/project-management\/'><span>Project management<\/span><\/a><\/div>\n","protected":false},"author":55,"featured_media":36198,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[169],"tags":[138,139,95],"contributing_author":[275],"class_list":["post-36199","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-article","tag-construction-advice","tag-industry-insights","tag-project-management","contributing_author-steve-miller"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.0 (Yoast SEO v28.0) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Lien Waivers in Construction: Types, Templates and Best Practices | Buildxact US<\/title>\n<meta name=\"description\" content=\"Learn what a lien waiver is in construction, the four main types, when to use each one, and how builders can avoid payment and lien risks.\" \/>\n<meta name=\"robots\" content=\"noindex, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Lien Waivers in Construction: Types, Templates, and Best Practices\" \/>\n<meta property=\"og:description\" content=\"Learn what a lien waiver is in construction, the four main types, when to use each one, and how builders can avoid payment and lien risks.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/stage.buildxact.com\/us\/article\/lien-waivers-in-construction-types-templates-and-best-practices\/\" \/>\n<meta property=\"og:site_name\" content=\"Buildxact US\" \/>\n<meta property=\"article:published_time\" content=\"2026-07-14T16:48:08+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/stage.buildxact.com\/us\/wp-content\/uploads\/sites\/2\/2026\/07\/Construction-Lien-Waiver-Process.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1296\" \/>\n\t<meta property=\"og:image:height\" content=\"906\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"foundation\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"foundation\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/stage.buildxact.com\\\/us\\\/article\\\/lien-waivers-in-construction-types-templates-and-best-practices\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/stage.buildxact.com\\\/us\\\/article\\\/lien-waivers-in-construction-types-templates-and-best-practices\\\/\"},\"author\":{\"name\":\"foundation\",\"@id\":\"https:\\\/\\\/stage.buildxact.com\\\/us\\\/#\\\/schema\\\/person\\\/9065873438068b02441d0da8cc981fb0\"},\"headline\":\"Lien Waivers in Construction: Types, Templates, and Best Practices\",\"datePublished\":\"2026-07-14T16:48:08+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/stage.buildxact.com\\\/us\\\/article\\\/lien-waivers-in-construction-types-templates-and-best-practices\\\/\"},\"wordCount\":1942,\"publisher\":{\"@id\":\"https:\\\/\\\/stage.buildxact.com\\\/us\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/stage.buildxact.com\\\/us\\\/article\\\/lien-waivers-in-construction-types-templates-and-best-practices\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/stage.buildxact.com\\\/us\\\/wp-content\\\/uploads\\\/sites\\\/2\\\/2026\\\/07\\\/Construction-Lien-Waiver-Process.png\",\"keywords\":[\"Construction advice\",\"Industry insights\",\"Project management\"],\"articleSection\":[\"Articles\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/stage.buildxact.com\\\/us\\\/article\\\/lien-waivers-in-construction-types-templates-and-best-practices\\\/\",\"url\":\"https:\\\/\\\/stage.buildxact.com\\\/us\\\/article\\\/lien-waivers-in-construction-types-templates-and-best-practices\\\/\",\"name\":\"Lien Waivers in Construction: Types, Templates and Best Practices | Buildxact US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/stage.buildxact.com\\\/us\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/stage.buildxact.com\\\/us\\\/article\\\/lien-waivers-in-construction-types-templates-and-best-practices\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/stage.buildxact.com\\\/us\\\/article\\\/lien-waivers-in-construction-types-templates-and-best-practices\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/stage.buildxact.com\\\/us\\\/wp-content\\\/uploads\\\/sites\\\/2\\\/2026\\\/07\\\/Construction-Lien-Waiver-Process.png\",\"datePublished\":\"2026-07-14T16:48:08+00:00\",\"description\":\"Learn what a lien waiver is in construction, the four main types, when to use each one, and how builders can avoid payment and lien risks.\",\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/stage.buildxact.com\\\/us\\\/article\\\/lien-waivers-in-construction-types-templates-and-best-practices\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/stage.buildxact.com\\\/us\\\/article\\\/lien-waivers-in-construction-types-templates-and-best-practices\\\/#primaryimage\",\"url\":\"https:\\\/\\\/stage.buildxact.com\\\/us\\\/wp-content\\\/uploads\\\/sites\\\/2\\\/2026\\\/07\\\/Construction-Lien-Waiver-Process.png\",\"contentUrl\":\"https:\\\/\\\/stage.buildxact.com\\\/us\\\/wp-content\\\/uploads\\\/sites\\\/2\\\/2026\\\/07\\\/Construction-Lien-Waiver-Process.png\",\"width\":1296,\"height\":906,\"caption\":\"A diagram representing the construction lien waiver process\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/stage.buildxact.com\\\/us\\\/#website\",\"url\":\"https:\\\/\\\/stage.buildxact.com\\\/us\\\/\",\"name\":\"Buildxact US\",\"description\":\"Estimating &amp; Job Management Software\",\"publisher\":{\"@id\":\"https:\\\/\\\/stage.buildxact.com\\\/us\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/stage.buildxact.com\\\/us\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/stage.buildxact.com\\\/us\\\/#organization\",\"name\":\"Buildxact US\",\"url\":\"https:\\\/\\\/stage.buildxact.com\\\/us\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/stage.buildxact.com\\\/us\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/stage.buildxact.com\\\/us\\\/wp-content\\\/uploads\\\/sites\\\/2\\\/2022\\\/01\\\/buildxact-logo.png\",\"contentUrl\":\"https:\\\/\\\/stage.buildxact.com\\\/us\\\/wp-content\\\/uploads\\\/sites\\\/2\\\/2022\\\/01\\\/buildxact-logo.png\",\"width\":278,\"height\":68,\"caption\":\"Buildxact US\"},\"image\":{\"@id\":\"https:\\\/\\\/stage.buildxact.com\\\/us\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/stage.buildxact.com\\\/us\\\/#\\\/schema\\\/person\\\/9065873438068b02441d0da8cc981fb0\",\"name\":\"foundation\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/1639025117d50be7cb6f7c1370885298dc98605d2fcd9be7ba5b4ccc3fb84a5e?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/1639025117d50be7cb6f7c1370885298dc98605d2fcd9be7ba5b4ccc3fb84a5e?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/1639025117d50be7cb6f7c1370885298dc98605d2fcd9be7ba5b4ccc3fb84a5e?s=96&d=mm&r=g\",\"caption\":\"foundation\"},\"url\":\"https:\\\/\\\/stage.buildxact.com\\\/us\\\/author\\\/foundation\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Lien Waivers in Construction: Types, Templates and Best Practices | Buildxact US","description":"Learn what a lien waiver is in construction, the four main types, when to use each one, and how builders can avoid payment and lien risks.","robots":{"index":"noindex","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"og_locale":"en_US","og_type":"article","og_title":"Lien Waivers in Construction: Types, Templates, and Best Practices","og_description":"Learn what a lien waiver is in construction, the four main types, when to use each one, and how builders can avoid payment and lien risks.","og_url":"https:\/\/stage.buildxact.com\/us\/article\/lien-waivers-in-construction-types-templates-and-best-practices\/","og_site_name":"Buildxact US","article_published_time":"2026-07-14T16:48:08+00:00","og_image":[{"width":1296,"height":906,"url":"https:\/\/stage.buildxact.com\/us\/wp-content\/uploads\/sites\/2\/2026\/07\/Construction-Lien-Waiver-Process.png","type":"image\/png"}],"author":"foundation","twitter_card":"summary_large_image","twitter_misc":{"Written by":"foundation","Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/stage.buildxact.com\/us\/article\/lien-waivers-in-construction-types-templates-and-best-practices\/#article","isPartOf":{"@id":"https:\/\/stage.buildxact.com\/us\/article\/lien-waivers-in-construction-types-templates-and-best-practices\/"},"author":{"name":"foundation","@id":"https:\/\/stage.buildxact.com\/us\/#\/schema\/person\/9065873438068b02441d0da8cc981fb0"},"headline":"Lien Waivers in Construction: Types, Templates, and Best Practices","datePublished":"2026-07-14T16:48:08+00:00","mainEntityOfPage":{"@id":"https:\/\/stage.buildxact.com\/us\/article\/lien-waivers-in-construction-types-templates-and-best-practices\/"},"wordCount":1942,"publisher":{"@id":"https:\/\/stage.buildxact.com\/us\/#organization"},"image":{"@id":"https:\/\/stage.buildxact.com\/us\/article\/lien-waivers-in-construction-types-templates-and-best-practices\/#primaryimage"},"thumbnailUrl":"https:\/\/stage.buildxact.com\/us\/wp-content\/uploads\/sites\/2\/2026\/07\/Construction-Lien-Waiver-Process.png","keywords":["Construction advice","Industry insights","Project management"],"articleSection":["Articles"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/stage.buildxact.com\/us\/article\/lien-waivers-in-construction-types-templates-and-best-practices\/","url":"https:\/\/stage.buildxact.com\/us\/article\/lien-waivers-in-construction-types-templates-and-best-practices\/","name":"Lien Waivers in Construction: Types, Templates and Best Practices | Buildxact US","isPartOf":{"@id":"https:\/\/stage.buildxact.com\/us\/#website"},"primaryImageOfPage":{"@id":"https:\/\/stage.buildxact.com\/us\/article\/lien-waivers-in-construction-types-templates-and-best-practices\/#primaryimage"},"image":{"@id":"https:\/\/stage.buildxact.com\/us\/article\/lien-waivers-in-construction-types-templates-and-best-practices\/#primaryimage"},"thumbnailUrl":"https:\/\/stage.buildxact.com\/us\/wp-content\/uploads\/sites\/2\/2026\/07\/Construction-Lien-Waiver-Process.png","datePublished":"2026-07-14T16:48:08+00:00","description":"Learn what a lien waiver is in construction, the four main types, when to use each one, and how builders can avoid payment and lien risks.","inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/stage.buildxact.com\/us\/article\/lien-waivers-in-construction-types-templates-and-best-practices\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/stage.buildxact.com\/us\/article\/lien-waivers-in-construction-types-templates-and-best-practices\/#primaryimage","url":"https:\/\/stage.buildxact.com\/us\/wp-content\/uploads\/sites\/2\/2026\/07\/Construction-Lien-Waiver-Process.png","contentUrl":"https:\/\/stage.buildxact.com\/us\/wp-content\/uploads\/sites\/2\/2026\/07\/Construction-Lien-Waiver-Process.png","width":1296,"height":906,"caption":"A diagram representing the construction lien waiver process"},{"@type":"WebSite","@id":"https:\/\/stage.buildxact.com\/us\/#website","url":"https:\/\/stage.buildxact.com\/us\/","name":"Buildxact US","description":"Estimating &amp; Job Management Software","publisher":{"@id":"https:\/\/stage.buildxact.com\/us\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/stage.buildxact.com\/us\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/stage.buildxact.com\/us\/#organization","name":"Buildxact US","url":"https:\/\/stage.buildxact.com\/us\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/stage.buildxact.com\/us\/#\/schema\/logo\/image\/","url":"https:\/\/stage.buildxact.com\/us\/wp-content\/uploads\/sites\/2\/2022\/01\/buildxact-logo.png","contentUrl":"https:\/\/stage.buildxact.com\/us\/wp-content\/uploads\/sites\/2\/2022\/01\/buildxact-logo.png","width":278,"height":68,"caption":"Buildxact US"},"image":{"@id":"https:\/\/stage.buildxact.com\/us\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/stage.buildxact.com\/us\/#\/schema\/person\/9065873438068b02441d0da8cc981fb0","name":"foundation","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/1639025117d50be7cb6f7c1370885298dc98605d2fcd9be7ba5b4ccc3fb84a5e?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/1639025117d50be7cb6f7c1370885298dc98605d2fcd9be7ba5b4ccc3fb84a5e?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/1639025117d50be7cb6f7c1370885298dc98605d2fcd9be7ba5b4ccc3fb84a5e?s=96&d=mm&r=g","caption":"foundation"},"url":"https:\/\/stage.buildxact.com\/us\/author\/foundation\/"}]}},"_links":{"self":[{"href":"https:\/\/stage.buildxact.com\/us\/wp-json\/wp\/v2\/posts\/36199","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/stage.buildxact.com\/us\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/stage.buildxact.com\/us\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/stage.buildxact.com\/us\/wp-json\/wp\/v2\/users\/55"}],"replies":[{"embeddable":true,"href":"https:\/\/stage.buildxact.com\/us\/wp-json\/wp\/v2\/comments?post=36199"}],"version-history":[{"count":4,"href":"https:\/\/stage.buildxact.com\/us\/wp-json\/wp\/v2\/posts\/36199\/revisions"}],"predecessor-version":[{"id":36218,"href":"https:\/\/stage.buildxact.com\/us\/wp-json\/wp\/v2\/posts\/36199\/revisions\/36218"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/stage.buildxact.com\/us\/wp-json\/wp\/v2\/media\/36198"}],"wp:attachment":[{"href":"https:\/\/stage.buildxact.com\/us\/wp-json\/wp\/v2\/media?parent=36199"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/stage.buildxact.com\/us\/wp-json\/wp\/v2\/categories?post=36199"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/stage.buildxact.com\/us\/wp-json\/wp\/v2\/tags?post=36199"},{"taxonomy":"contributing_author","embeddable":true,"href":"https:\/\/stage.buildxact.com\/us\/wp-json\/wp\/v2\/contributing_author?post=36199"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}