{"id":36501,"date":"2026-10-13T16:18:17","date_gmt":"2026-10-13T20:18:17","guid":{"rendered":"https:\/\/stage.buildxact.com\/us\/?p=36501"},"modified":"2026-10-13T16:18:17","modified_gmt":"2026-10-13T20:18:17","slug":"roofing-project-management-how-to-keep-jobs-on-track-and-profitable","status":"publish","type":"post","link":"https:\/\/stage.buildxact.com\/us\/blog\/roofing-project-management-how-to-keep-jobs-on-track-and-profitable\/","title":{"rendered":"Roofing Project Management: How to Keep Jobs on Track and Profitable"},"content":{"rendered":"\n<p>You&#8217;ve bid the job, ordered the materials, and put a crew on the roof. Three weeks later, you&#8217;re looking at the numbers, and the margin you planned for isn&#8217;t there.<\/p>\n\n\n\n<p>Nothing went wrong on the job itself, at least not in an obvious way.<\/p>\n\n\n\n<p>What happened is your <a href=\"https:\/\/www.buildxact.com\/us\/ebook\/improve-construction-profit-margin\/\">profit margin<\/a> leaked out at the seams: an estimate that missed a line item, a schedule that got knocked sideways by rain, a material order that didn&#8217;t quite match the takeoff, a cost nobody was watching until the invoices came in.<\/p>\n\n\n\n<p>That didn\u2019t happen when it was just you running jobs. But now that you\u2019re scaling and have several jobs (with different estimators and crews) running at once, margin leakage is becoming a problem.<\/p>\n\n\n\n<p>A solid roofing project management process, one that is standardized across the entire firm, catches those leaks.<\/p>\n\n\n\n<p>This guide explores how roofing project management should run across the full job lifecycle, from estimate through final inspection, and shows how your teams should manage each stage so the margin you bid is the margin you keep.<\/p>\n\n\n\n<p>There&#8217;s a downloadable checklist at the end for you to take into your next job.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Key Takeaways&nbsp;<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Roofing project management must work as a repeatable system that your whole team runs the same way, not a skill one person has or a hire you&#8217;re missing.<\/li>\n\n\n\n<li>Margin gets set during estimating, so a shared takeoff process and a single pricing source across all estimators protect the ceiling on what a job can return.<\/li>\n\n\n\n<li>A crew schedule only works at scale if it&#8217;s built from real task dependencies, shared between office and field, with a buffer built in for weather-exposed work.<\/li>\n\n\n\n<li>Material orders need to trace back to the takeoff on every job, using the same process regardless of who&#8217;s placing the order, so the order matches what was priced and reconciles against the invoice.<\/li>\n\n\n\n<li>Cost visibility has to be built into the system, so committed and actual costs get checked against the estimate the same way on every job.<\/li>\n\n\n\n<li>A standardized punch list and safety record turn final inspection into a clean handover on every job.<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">Why Your Roofing Project Management Process Isn\u2019t Working Anymore&nbsp;<\/h2>\n\n\n\n<p>The process that worked when you were running every job yourself often stops working once you hit a certain scale.<\/p>\n\n\n\n<p>Growing past owner-operator means more crews working concurrent jobs, more <a href=\"https:\/\/www.buildxact.com\/us\/blog\/what-does-a-construction-estimator-do\/\">estimators<\/a> writing bids their own way instead of one way, more rogue spreadsheets that don&#8217;t line up with each other, and more paperwork riding on every job for bonding, insurance, or the next <a href=\"https:\/\/www.buildxact.com\/us\/blog\/rfp-vs-rfq\/\">RFP<\/a>.<\/p>\n\n\n\n<p>Those growing pains show up as real money lost. Buildxact\u2019s own data shows:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>$18,416 in missed line items per job on average<\/li>\n\n\n\n<li>$24,092 in tracked change orders per job<\/li>\n<\/ul>\n\n\n\n<p>And once you&#8217;ve got a dozen-plus jobs happening a year across multiple estimators, that&#8217;s not one bad estimate on one job anymore. It&#8217;s a serious margin leak that compounds across the whole book of business, job after job, quarter after quarter.<\/p>\n\n\n\n<p>The firms that get past this stage do it through standardization: one system of record, one change order process, one <a href=\"https:\/\/www.buildxact.com\/us\/blog\/estimating-templates-homeowner-trust\/\">estimating template<\/a>, and a pricing source that every estimator on the team actually uses. The results of this speak for themselves, 7% net profit margin compared to the standard benchmark of 3%.&nbsp;<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Project Management Across The Roofing Project Lifecycle<\/h2>\n\n\n\n<figure data-wp-context=\"{&quot;imageId&quot;:&quot;6acec0e2bee6c&quot;}\" data-wp-interactive=\"core\/image\" data-wp-key=\"6acec0e2bee6c\" class=\"wp-block-image alignwide size-large wp-lightbox-container\"><img decoding=\"async\" data-wp-class--hide=\"state.isContentHidden\" data-wp-class--show=\"state.isContentVisible\" data-wp-init=\"callbacks.setButtonStyles\" data-wp-on--click=\"actions.showLightbox\" data-wp-on--load=\"callbacks.setButtonStyles\" data-wp-on-window--resize=\"callbacks.setButtonStyles\" src=\"https:\/\/cdn.mediavalet.com\/usca\/buildxact\/Dk8d3em5xUaSMtK95LHhdw\/uiWS5NVexUemngMn2A7rAQ\/Large\/The%20Roofing%20Project%20Management%20Lifecycle.jpeg?f=auto\" alt=\"\"\/><button\n\t\t\tclass=\"lightbox-trigger\"\n\t\t\ttype=\"button\"\n\t\t\taria-haspopup=\"dialog\"\n\t\t\taria-label=\"Enlarge\"\n\t\t\tdata-wp-init=\"callbacks.initTriggerButton\"\n\t\t\tdata-wp-on--click=\"actions.showLightbox\"\n\t\t\tdata-wp-style--right=\"state.imageButtonRight\"\n\t\t\tdata-wp-style--top=\"state.imageButtonTop\"\n\t\t>\n\t\t\t<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"12\" height=\"12\" fill=\"none\" viewBox=\"0 0 12 12\">\n\t\t\t\t<path fill=\"#fff\" d=\"M2 0a2 2 0 0 0-2 2v2h1.5V2a.5.5 0 0 1 .5-.5h2V0H2Zm2 10.5H2a.5.5 0 0 1-.5-.5V8H0v2a2 2 0 0 0 2 2h2v-1.5ZM8 12v-1.5h2a.5.5 0 0 0 .5-.5V8H12v2a2 2 0 0 1-2 2H8Zm2-12a2 2 0 0 1 2 2v2h-1.5V2a.5.5 0 0 0-.5-.5H8V0h2Z\" \/>\n\t\t\t<\/svg>\n\t\t<\/button><\/figure>\n\n\n\n<div style=\"height:42px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h3 class=\"wp-block-heading\">Estimating&nbsp;<\/h3>\n\n\n\n<p>Estimates are what win or lose jobs for most roofers.&nbsp;<\/p>\n\n\n\n<p><br>A bid that&#8217;s slow to go out loses the job to whoever got there first, while a bid that&#8217;s missing a line item might win the job, but end up killing your margin.<\/p>\n\n\n\n<p>The fix is a standardized <a href=\"https:\/\/www.buildxact.com\/au\/blog\/construction-takeoff\/\">takeoff process<\/a>.<\/p>\n\n\n\n<p>Have estimators measure the roof directly from the plans, so they\u2019re working from exact material quantities instead of a hand-counted or eyeballed figure. They\u2019ll then need to tie those quantities to current dealer pricing (live where possible) so the number you&#8217;re bidding reflects what materials cost right now, not what they cost on the last job.<\/p>\n\n\n\n<p><a href=\"https:\/\/www.buildxact.com\/us\/blu-ai-construction-assistant\/\">Blu, Buildxact&#8217;s AI co-pilot<\/a>, helps you get estimates out faster <em>without<\/em> sacrificing accuracy or adherence to process.<\/p>\n\n\n\n<p>Takeoff Assistant connects measurements directly to the estimate, and Estimate Reviewer checks the finished bid for anything missing before it goes out the door, so you don\u2019t exclude a line item that later eats into your margin.<\/p>\n\n\n\n<figure data-wp-context=\"{&quot;imageId&quot;:&quot;6acec0e2bf2a6&quot;}\" data-wp-interactive=\"core\/image\" data-wp-key=\"6acec0e2bf2a6\" class=\"wp-block-image alignwide size-large wp-lightbox-container\"><img decoding=\"async\" data-wp-class--hide=\"state.isContentHidden\" data-wp-class--show=\"state.isContentVisible\" data-wp-init=\"callbacks.setButtonStyles\" data-wp-on--click=\"actions.showLightbox\" data-wp-on--load=\"callbacks.setButtonStyles\" data-wp-on-window--resize=\"callbacks.setButtonStyles\" src=\"https:\/\/cdn.mediavalet.com\/usca\/buildxact\/Wet062bf6E2pINvN4oKYWw\/4v6TAVimGUqkVxxm5G3UVA\/Large\/AnimatedBluTakeOffAsistant_US_1040x585_20fps.jpeg?f=auto\" alt=\"\"\/><button\n\t\t\tclass=\"lightbox-trigger\"\n\t\t\ttype=\"button\"\n\t\t\taria-haspopup=\"dialog\"\n\t\t\taria-label=\"Enlarge\"\n\t\t\tdata-wp-init=\"callbacks.initTriggerButton\"\n\t\t\tdata-wp-on--click=\"actions.showLightbox\"\n\t\t\tdata-wp-style--right=\"state.imageButtonRight\"\n\t\t\tdata-wp-style--top=\"state.imageButtonTop\"\n\t\t>\n\t\t\t<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"12\" height=\"12\" fill=\"none\" viewBox=\"0 0 12 12\">\n\t\t\t\t<path fill=\"#fff\" d=\"M2 0a2 2 0 0 0-2 2v2h1.5V2a.5.5 0 0 1 .5-.5h2V0H2Zm2 10.5H2a.5.5 0 0 1-.5-.5V8H0v2a2 2 0 0 0 2 2h2v-1.5ZM8 12v-1.5h2a.5.5 0 0 0 .5-.5V8H12v2a2 2 0 0 1-2 2H8Zm2-12a2 2 0 0 1 2 2v2h-1.5V2a.5.5 0 0 0-.5-.5H8V0h2Z\" \/>\n\t\t\t<\/svg>\n\t\t<\/button><\/figure>\n\n\n\n<div style=\"height:44px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p>Here\u2019s the big reason why standardization here matters:<\/p>\n\n\n\n<p>Whatever margin gets priced in at this stage is the most the job will ever return.<\/p>\n\n\n\n<p>Nothing downstream will solve for a missed quantity or an underpriced material once the crew is on the roof, which is why the estimate isn&#8217;t just the starting point of the job, but the ceiling on what the job can make.<\/p>\n\n\n\n<p>Saved templates and assemblies help protect that ceiling. Building the recurring parts of a roofing job (tear-off, underlayment, flashing, disposal, etc) into a template means a line item can&#8217;t slip through under time pressure, the way it can when every estimate gets built from scratch.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Crew scheduling and weather contingency&nbsp;<\/h3>\n\n\n\n<p>A schedule is only worth its salt if it still works when something changes, and on roofing jobs, something always changes.<\/p>\n\n\n\n<p>A crew runs long on tear-off, a delivery slips a day, rain rolls in, and suddenly the whole schedule needs a rebuild, and it&#8217;s probably you they call to do it.<\/p>\n\n\n\n<p>There are three big steps you can take to build a schedule with enough buffer in it that your team can handle the rebuild themselves, instead of it landing back on your desk every time something shifts:<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li>Start from a full task list in sequence (tear-off, dry-in, install, flashing, cleanup) with a duration and a dependency for each, so one crew&#8217;s delay visibly pushes the next task instead of getting discovered on site.<\/li>\n\n\n\n<li>Assign crews and materials to each task so nothing&#8217;s double-booked, and keep the schedule as one shared plan the field and office both look at, rather than a version in the office and a different one in a text thread.<\/li>\n\n\n\n<li><a href=\"https:\/\/www.buildxact.com\/us\/blog\/how-to-estimate-construction-time\/\">Link the schedule to the estimate<\/a> so a task can&#8217;t drift from what was actually priced and scoped.<\/li>\n<\/ol>\n\n\n\n<p>Buildxact&#8217;s <a href=\"https:\/\/www.buildxact.com\/us\/features\/construction-scheduling-software\/\">scheduling software<\/a> builds the schedule directly from the estimate, so there&#8217;s no separate version to reconcile against what was bid. It tracks the critical path and allows you to adjust the timeline when a task falls behind, and keeps the field and office looking at the same plan through Buildxact Onsite.<\/p>\n\n\n\n<figure data-wp-context=\"{&quot;imageId&quot;:&quot;6acec0e2bf7c8&quot;}\" data-wp-interactive=\"core\/image\" data-wp-key=\"6acec0e2bf7c8\" class=\"wp-block-image alignwide size-large wp-lightbox-container\"><img decoding=\"async\" data-wp-class--hide=\"state.isContentHidden\" data-wp-class--show=\"state.isContentVisible\" data-wp-init=\"callbacks.setButtonStyles\" data-wp-on--click=\"actions.showLightbox\" data-wp-on--load=\"callbacks.setButtonStyles\" data-wp-on-window--resize=\"callbacks.setButtonStyles\" src=\"https:\/\/cdn.mediavalet.com\/usca\/buildxact\/8cwTVSn10kGFY_SYDdDV4Q\/bqa6aFsbWEqkFJcarX1UOw\/Original\/Real-time%20construction%20schedule%20updates%20in%20Buildxact.png?f=auto\" alt=\"\"\/><button\n\t\t\tclass=\"lightbox-trigger\"\n\t\t\ttype=\"button\"\n\t\t\taria-haspopup=\"dialog\"\n\t\t\taria-label=\"Enlarge\"\n\t\t\tdata-wp-init=\"callbacks.initTriggerButton\"\n\t\t\tdata-wp-on--click=\"actions.showLightbox\"\n\t\t\tdata-wp-style--right=\"state.imageButtonRight\"\n\t\t\tdata-wp-style--top=\"state.imageButtonTop\"\n\t\t>\n\t\t\t<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"12\" height=\"12\" fill=\"none\" viewBox=\"0 0 12 12\">\n\t\t\t\t<path fill=\"#fff\" d=\"M2 0a2 2 0 0 0-2 2v2h1.5V2a.5.5 0 0 1 .5-.5h2V0H2Zm2 10.5H2a.5.5 0 0 1-.5-.5V8H0v2a2 2 0 0 0 2 2h2v-1.5ZM8 12v-1.5h2a.5.5 0 0 0 .5-.5V8H12v2a2 2 0 0 1-2 2H8Zm2-12a2 2 0 0 1 2 2v2h-1.5V2a.5.5 0 0 0-.5-.5H8V0h2Z\" \/>\n\t\t\t<\/svg>\n\t\t<\/button><\/figure>\n\n\n\n<div style=\"height:44px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p>Weather adds a layer roofing has to plan for that most interior trades don&#8217;t. Rain, high wind, and ice halt roofing work outright, so the crew needs a clear way to make the call before a truck even leaves the yard, not after everyone&#8217;s standing on a wet roof.<\/p>\n\n\n\n<p>The foreman should be checking forecasts and severe-weather alerts the night before and again first thing in the morning, specifically for the job site&#8217;s location and the tasks scheduled that day. Tear-off and dry-in are the ones that can&#8217;t get rained on halfway through, so those are the calls that matter most. If conditions look borderline, that decision gets run up to the office before the crew rolls out, not decided on site once they&#8217;re already there.<\/p>\n\n\n\n<p>When a job does get rained out, work with the foreman to move the crew onto another job rather than losing the day, and update the schedule right away so the delay is visible to office and field at the same time.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Material ordering&nbsp;<\/h3>\n\n\n\n<p>If a material order doesn\u2019t match the original takeoff, you end up with reorders, delays, and cost overruns.<\/p>\n\n\n\n<p>Following these <a href=\"https:\/\/www.buildxact.com\/us\/blog\/construction-procurement\/\">procurement<\/a> rules on each project will help you keep the order matched to what was actually priced and measured:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Tie the material order to the estimate&#8217;s takeoff quantities, and order against current local pricing rather than last month&#8217;s numbers.<\/li>\n\n\n\n<li>Generate the material order directly from the estimate or job, by selecting the line items already priced there, rather than rebuilding a materials list from scratch. This is what keeps the order matched to the takeoff instead of drifting from it.<\/li>\n\n\n\n<li>Reconcile the order against the invoice when it lands, checking quantity and price against what was actually estimated, so a pricing or quantity mismatch is caught before it&#8217;s paid rather than after.<\/li>\n<\/ul>\n\n\n\n<p>Buildxact&#8217;s material dealer connection ties that whole process to live pricing through <a href=\"https:\/\/www.buildxact.com\/us\/features\/builder-remodeler\/supplier-connection\/\">The Home Depot integration<\/a>. Orders get placed straight from the estimate and receipts capture automatically, so what gets ordered maps back to the original takeoff and what gets paid maps back to the original estimate.<\/p>\n\n\n\n<figure data-wp-context=\"{&quot;imageId&quot;:&quot;6acec0e2bfbf5&quot;}\" data-wp-interactive=\"core\/image\" data-wp-key=\"6acec0e2bfbf5\" class=\"wp-block-image alignwide size-large wp-lightbox-container\"><img decoding=\"async\" data-wp-class--hide=\"state.isContentHidden\" data-wp-class--show=\"state.isContentVisible\" data-wp-init=\"callbacks.setButtonStyles\" data-wp-on--click=\"actions.showLightbox\" data-wp-on--load=\"callbacks.setButtonStyles\" data-wp-on-window--resize=\"callbacks.setButtonStyles\" src=\"https:\/\/cdn.mediavalet.com\/usca\/buildxact\/tRwHpzdp7keHZB3OXfAvaQ\/3OcgYdROlkOeP4UOa2o5KA\/Large\/Allocating%20Home%20Depot%20Receipts%20to%20Estimate%20Line%20Items%20in%20Buildxact.png?f=auto\" alt=\"\"\/><button\n\t\t\tclass=\"lightbox-trigger\"\n\t\t\ttype=\"button\"\n\t\t\taria-haspopup=\"dialog\"\n\t\t\taria-label=\"Enlarge\"\n\t\t\tdata-wp-init=\"callbacks.initTriggerButton\"\n\t\t\tdata-wp-on--click=\"actions.showLightbox\"\n\t\t\tdata-wp-style--right=\"state.imageButtonRight\"\n\t\t\tdata-wp-style--top=\"state.imageButtonTop\"\n\t\t>\n\t\t\t<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"12\" height=\"12\" fill=\"none\" viewBox=\"0 0 12 12\">\n\t\t\t\t<path fill=\"#fff\" d=\"M2 0a2 2 0 0 0-2 2v2h1.5V2a.5.5 0 0 1 .5-.5h2V0H2Zm2 10.5H2a.5.5 0 0 1-.5-.5V8H0v2a2 2 0 0 0 2 2h2v-1.5ZM8 12v-1.5h2a.5.5 0 0 0 .5-.5V8H12v2a2 2 0 0 1-2 2H8Zm2-12a2 2 0 0 1 2 2v2h-1.5V2a.5.5 0 0 0-.5-.5H8V0h2Z\" \/>\n\t\t\t<\/svg>\n\t\t<\/button><\/figure>\n\n\n\n<div style=\"height:44px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h3 class=\"wp-block-heading\">Cost tracking&nbsp;<\/h3>\n\n\n\n<p>With multiple projects on the go at once, cost data that lives in texts, spreadsheets, or the owner\u2019s head just doesn\u2019t scale.&nbsp;<\/p>\n\n\n\n<p>If you don\u2019t have a live, running view of actual cost against budget, you have no signal to take action while there\u2019s still time, and you end up slowly losing margin across the life of a job.<\/p>\n\n\n\n<p>Here\u2019s how to standardize cost visibility across jobs:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Set up an automatic task in your <a href=\"https:\/\/www.buildxact.com\/au\/blog\/top-project-management-tools\/\">PM tool <\/a>that reminds you to check actual spend against the estimate, triggered by a milestone or a set number of days. This ensures the check happens the same way on every job instead of depending on someone remembering to run it.<\/li>\n\n\n\n<li>Build committed cost (purchase and work orders raised against the job) and actual cost (what&#8217;s been invoiced and paid) into the job setup as two tracked categories from day one. This ensures the split exists on every job by default rather than depending on how any one estimator or PM chooses to track it.<\/li>\n\n\n\n<li>Make logging a <a href=\"https:\/\/www.buildxact.com\/us\/blog\/change-order\/\">change order<\/a> a required step before work proceeds, not a habit left to whoever&#8217;s running the job. This ensures the extra cost and scope get logged against the job every time, instead of only when someone remembers to write it down.<\/li>\n<\/ul>\n\n\n\n<p><a href=\"https:\/\/www.buildxact.com\/us\/features\/construction-cost-tracking-software\/\">Buildxact&#8217;s cost tracking tools<\/a> give every job the same structure by default. Purchase and work orders get created straight from the estimate, so committed cost is tracked from the moment it&#8217;s raised, and actual spend gets checked against the estimate line by line or by job category, using the same breakdown no matter who&#8217;s running the job.<\/p>\n\n\n\n<figure data-wp-context=\"{&quot;imageId&quot;:&quot;6acec0e2c0075&quot;}\" data-wp-interactive=\"core\/image\" data-wp-key=\"6acec0e2c0075\" class=\"wp-block-image alignwide size-full wp-lightbox-container\"><img fetchpriority=\"high\" decoding=\"async\" width=\"938\" height=\"572\" data-wp-class--hide=\"state.isContentHidden\" data-wp-class--show=\"state.isContentVisible\" data-wp-init=\"callbacks.setButtonStyles\" data-wp-on--click=\"actions.showLightbox\" data-wp-on--load=\"callbacks.setButtonStyles\" data-wp-on-window--resize=\"callbacks.setButtonStyles\" src=\"https:\/\/stage.buildxact.com\/wp-content\/uploads\/2026\/08\/image-17.png\" alt=\"\" class=\"wp-image-36500\" srcset=\"https:\/\/stage.buildxact.com\/us\/wp-content\/uploads\/sites\/2\/2026\/08\/image-17.png 938w, https:\/\/stage.buildxact.com\/us\/wp-content\/uploads\/sites\/2\/2026\/08\/image-17-300x183.png 300w, https:\/\/stage.buildxact.com\/us\/wp-content\/uploads\/sites\/2\/2026\/08\/image-17-768x468.png 768w\" sizes=\"(max-width: 938px) 100vw, 938px\" \/><button\n\t\t\tclass=\"lightbox-trigger\"\n\t\t\ttype=\"button\"\n\t\t\taria-haspopup=\"dialog\"\n\t\t\taria-label=\"Enlarge\"\n\t\t\tdata-wp-init=\"callbacks.initTriggerButton\"\n\t\t\tdata-wp-on--click=\"actions.showLightbox\"\n\t\t\tdata-wp-style--right=\"state.imageButtonRight\"\n\t\t\tdata-wp-style--top=\"state.imageButtonTop\"\n\t\t>\n\t\t\t<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"12\" height=\"12\" fill=\"none\" viewBox=\"0 0 12 12\">\n\t\t\t\t<path fill=\"#fff\" d=\"M2 0a2 2 0 0 0-2 2v2h1.5V2a.5.5 0 0 1 .5-.5h2V0H2Zm2 10.5H2a.5.5 0 0 1-.5-.5V8H0v2a2 2 0 0 0 2 2h2v-1.5ZM8 12v-1.5h2a.5.5 0 0 0 .5-.5V8H12v2a2 2 0 0 1-2 2H8Zm2-12a2 2 0 0 1 2 2v2h-1.5V2a.5.5 0 0 0-.5-.5H8V0h2Z\" \/>\n\t\t\t<\/svg>\n\t\t<\/button><\/figure>\n\n\n\n<div style=\"height:44px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h3 class=\"wp-block-heading\">Final inspection&nbsp;<\/h3>\n\n\n\n<p>A failed inspection or a messy handover costs more than the callback. It delays final payment, and it&#8217;s the kind of thing a client remembers when someone asks them for a referral.<\/p>\n\n\n\n<p>Here&#8217;s how to standardize closeout so it runs the same way regardless of who&#8217;s running it:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Keep fall-protection and jobsite safety documentation running throughout the job against <a href=\"https:\/\/www.osha.gov\/fall-protection\/standards\">OSHA&#8217;s fall-protection standard<\/a>, ensuring the record exists the same way on every job, whether it&#8217;s ever needed or not.<\/li>\n\n\n\n<li>Walk the site yourself before the client does, checking for incomplete work, defects, and anything that doesn&#8217;t meet the <a href=\"https:\/\/www.iccsafe.org\/products-and-services\/i-codes\/the-i-codes\/\">International Code Council&#8217;s I-Codes<\/a>, not just workmanship. Photograph anything that needs fixing so nothing gets found by the prime contractor.<\/li>\n\n\n\n<li>Use one punch list format across every job: a description, a location, a photo, and a name and completion date attached to each item. A consistent format means any crew lead can pick up the list on any job and know exactly what&#8217;s expected.<\/li>\n\n\n\n<li>Fix the punch list sequence in advance (carpentry fixes before paint touch-ups, for example), so nothing gets reworked out of order no matter who&#8217;s running the crew. Verify each item is actually resolved before it gets marked closed.<\/li>\n<\/ul>\n\n\n\n<p>Once every item is closed, do the final walkthrough with the prime contractor, collect sign-off, and process final payment.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Your Roofing Project Management Checklist&nbsp;<\/h2>\n\n\n\n<p>This downloadable roofing PM checklist follows the same stage-gate checks broken down in this guide, formatted so every estimator and crew lead can run them the same way on every job: takeoff-to-estimate reconciliation, committed-vs-actual variance thresholds, a weather-buffer sign-off, and a documented <a href=\"https:\/\/www.buildxact.com\/us\/blog\/construction-punch-list\/\">punch list<\/a> and safety record you can hand straight to a bonding company or attach to your next bid.<\/p>\n\n\n\n<p><strong><a href=\"https:\/\/cdn.mediavalet.com\/usca\/buildxact\/5WCfXqseC06Du5tR5heHzA\/mdQMaHRI9Uy9zHc3YQhNOw\/Original\/Buildxact%20-%20roofing%20project%20management%20template.xlsx\">Download the roofing project management checklist.<\/a><\/strong><\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Which Roofing Project Management Software Should You Use?&nbsp;<\/h2>\n\n\n\n<p>Standardization of project management processes is what lets you keep scaling without losing margin as you go. Without it, the leak just gets bigger as you take on more jobs.<\/p>\n\n\n\n<p>The right project management software supports that standardization: it puts every estimator on the same numbers, the same templates, and the same system of record, instead of a dozen versions of the same job living in a dozen different spreadsheets.<\/p>\n\n\n\n<p>When choosing a roofing project management platform, look for a tool that connects the whole job rather than one that solves a single piece of it. Then, evaluate based on:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Whether the takeoff quantities flow straight into the estimate<\/li>\n\n\n\n<li>Whether pricing pulls from live dealer data rather than a static list<\/li>\n\n\n\n<li>Whether cost tracking compares actual spend to the original budget as the job runs<\/li>\n\n\n\n<li>Whether the pricing itself is transparent across plans, rather than something you have to ask a sales rep to explain<\/li>\n<\/ul>\n\n\n\n<p>Builders using Buildxact win 1 in 3 bids (compared to the standard 1 in 6) because it hits all of those standardization requirements.<\/p>\n\n\n\n<p><a href=\"https:\/\/www.buildxact.com\/us\/blog\/quantity-takeoff\/\">Takeoff quantities<\/a> are tied straight into the estimate, so the number you bid is the number the job was actually measured for. Pricing pulls from live dealer data, so the estimate reflects what materials cost today, and cost tracking helps you see actual spend against the original budget, letting you act while there\u2019s still time to save the job\u2019s margin.<\/p>\n\n\n\n<p><a href=\"https:\/\/www.buildxact.com\/au\/schedule-a-demo\/\">Book a demo<\/a> to see how Buildxact supports growing roofers.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>You&#8217;ve bid the job, ordered the materials, and put a crew on the roof. Three weeks later, you&#8217;re looking at the numbers, and the margin you planned for isn&#8217;t there.<\/p>\n<p>Nothing went wrong on the job itself, at least not in an obvious way.<\/p>\n<p>What happened is your profit margin leaked out at the seams: an estimate that missed a line item, a schedule that got knocked sideways by rain,<\/p>\n<div style=\"display:none;\" class=\"postcatlist\"><a href='https:\/\/stage.buildxact.com\/us\/tag\/roofing-project-management\/'><span>roofing project management<\/span><\/a><\/div>\n","protected":false},"author":55,"featured_media":36499,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[25],"tags":[310],"contributing_author":[275],"class_list":["post-36501","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog","tag-roofing-project-management","contributing_author-steve-miller"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.1 (Yoast SEO v28.1) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Roofing Project Management Guide for Pros | Buildxact US<\/title>\n<meta name=\"description\" content=\"Run roofing jobs from estimate to final inspection. Schedule crews, order materials, track costs, and protect your margin on every job.\" \/>\n<meta name=\"robots\" content=\"noindex, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Roofing Project Management: How to Keep Jobs on Track and Profitable\" \/>\n<meta property=\"og:description\" content=\"Run roofing jobs from estimate to final inspection. Schedule crews, order materials, track costs, and protect your margin on every job.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/stage.buildxact.com\/us\/blog\/roofing-project-management-how-to-keep-jobs-on-track-and-profitable\/\" \/>\n<meta property=\"og:site_name\" content=\"Buildxact US\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-13T20:18:17+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/stage.buildxact.com\/us\/wp-content\/uploads\/sites\/2\/2026\/08\/Image-1-3.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1296\" \/>\n\t<meta property=\"og:image:height\" content=\"730\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"foundation\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"foundation\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"11 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/stage.buildxact.com\\\/us\\\/blog\\\/roofing-project-management-how-to-keep-jobs-on-track-and-profitable\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/stage.buildxact.com\\\/us\\\/blog\\\/roofing-project-management-how-to-keep-jobs-on-track-and-profitable\\\/\"},\"author\":{\"name\":\"foundation\",\"@id\":\"https:\\\/\\\/stage.buildxact.com\\\/us\\\/#\\\/schema\\\/person\\\/9065873438068b02441d0da8cc981fb0\"},\"headline\":\"Roofing Project Management: How to Keep Jobs on Track and Profitable\",\"datePublished\":\"2026-10-13T20:18:17+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/stage.buildxact.com\\\/us\\\/blog\\\/roofing-project-management-how-to-keep-jobs-on-track-and-profitable\\\/\"},\"wordCount\":2313,\"publisher\":{\"@id\":\"https:\\\/\\\/stage.buildxact.com\\\/us\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/stage.buildxact.com\\\/us\\\/blog\\\/roofing-project-management-how-to-keep-jobs-on-track-and-profitable\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/stage.buildxact.com\\\/us\\\/wp-content\\\/uploads\\\/sites\\\/2\\\/2026\\\/08\\\/Image-1-3.png\",\"keywords\":[\"roofing project management\"],\"articleSection\":[\"Blogs\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/stage.buildxact.com\\\/us\\\/blog\\\/roofing-project-management-how-to-keep-jobs-on-track-and-profitable\\\/\",\"url\":\"https:\\\/\\\/stage.buildxact.com\\\/us\\\/blog\\\/roofing-project-management-how-to-keep-jobs-on-track-and-profitable\\\/\",\"name\":\"Roofing Project Management Guide for Pros | Buildxact US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/stage.buildxact.com\\\/us\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/stage.buildxact.com\\\/us\\\/blog\\\/roofing-project-management-how-to-keep-jobs-on-track-and-profitable\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/stage.buildxact.com\\\/us\\\/blog\\\/roofing-project-management-how-to-keep-jobs-on-track-and-profitable\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/stage.buildxact.com\\\/us\\\/wp-content\\\/uploads\\\/sites\\\/2\\\/2026\\\/08\\\/Image-1-3.png\",\"datePublished\":\"2026-10-13T20:18:17+00:00\",\"description\":\"Run roofing jobs from estimate to final inspection. Schedule crews, order materials, track costs, and protect your margin on every job.\",\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/stage.buildxact.com\\\/us\\\/blog\\\/roofing-project-management-how-to-keep-jobs-on-track-and-profitable\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/stage.buildxact.com\\\/us\\\/blog\\\/roofing-project-management-how-to-keep-jobs-on-track-and-profitable\\\/#primaryimage\",\"url\":\"https:\\\/\\\/stage.buildxact.com\\\/us\\\/wp-content\\\/uploads\\\/sites\\\/2\\\/2026\\\/08\\\/Image-1-3.png\",\"contentUrl\":\"https:\\\/\\\/stage.buildxact.com\\\/us\\\/wp-content\\\/uploads\\\/sites\\\/2\\\/2026\\\/08\\\/Image-1-3.png\",\"width\":1296,\"height\":730,\"caption\":\"Roofing crew member on a residential job site checking a job schedule on a tablet\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/stage.buildxact.com\\\/us\\\/#website\",\"url\":\"https:\\\/\\\/stage.buildxact.com\\\/us\\\/\",\"name\":\"Buildxact US\",\"description\":\"Estimating &amp; Job Management Software\",\"publisher\":{\"@id\":\"https:\\\/\\\/stage.buildxact.com\\\/us\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/stage.buildxact.com\\\/us\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/stage.buildxact.com\\\/us\\\/#organization\",\"name\":\"Buildxact US\",\"url\":\"https:\\\/\\\/stage.buildxact.com\\\/us\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/stage.buildxact.com\\\/us\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/stage.buildxact.com\\\/us\\\/wp-content\\\/uploads\\\/sites\\\/2\\\/2022\\\/01\\\/buildxact-logo.png\",\"contentUrl\":\"https:\\\/\\\/stage.buildxact.com\\\/us\\\/wp-content\\\/uploads\\\/sites\\\/2\\\/2022\\\/01\\\/buildxact-logo.png\",\"width\":278,\"height\":68,\"caption\":\"Buildxact US\"},\"image\":{\"@id\":\"https:\\\/\\\/stage.buildxact.com\\\/us\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/stage.buildxact.com\\\/us\\\/#\\\/schema\\\/person\\\/9065873438068b02441d0da8cc981fb0\",\"name\":\"foundation\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/1639025117d50be7cb6f7c1370885298dc98605d2fcd9be7ba5b4ccc3fb84a5e?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/1639025117d50be7cb6f7c1370885298dc98605d2fcd9be7ba5b4ccc3fb84a5e?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/1639025117d50be7cb6f7c1370885298dc98605d2fcd9be7ba5b4ccc3fb84a5e?s=96&d=mm&r=g\",\"caption\":\"foundation\"},\"url\":\"https:\\\/\\\/stage.buildxact.com\\\/us\\\/author\\\/foundation\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Roofing Project Management Guide for Pros | Buildxact US","description":"Run roofing jobs from estimate to final inspection. Schedule crews, order materials, track costs, and protect your margin on every job.","robots":{"index":"noindex","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"og_locale":"en_US","og_type":"article","og_title":"Roofing Project Management: How to Keep Jobs on Track and Profitable","og_description":"Run roofing jobs from estimate to final inspection. Schedule crews, order materials, track costs, and protect your margin on every job.","og_url":"https:\/\/stage.buildxact.com\/us\/blog\/roofing-project-management-how-to-keep-jobs-on-track-and-profitable\/","og_site_name":"Buildxact US","article_published_time":"2026-10-13T20:18:17+00:00","og_image":[{"width":1296,"height":730,"url":"https:\/\/stage.buildxact.com\/us\/wp-content\/uploads\/sites\/2\/2026\/08\/Image-1-3.png","type":"image\/png"}],"author":"foundation","twitter_card":"summary_large_image","twitter_misc":{"Written by":"foundation","Est. reading time":"11 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/stage.buildxact.com\/us\/blog\/roofing-project-management-how-to-keep-jobs-on-track-and-profitable\/#article","isPartOf":{"@id":"https:\/\/stage.buildxact.com\/us\/blog\/roofing-project-management-how-to-keep-jobs-on-track-and-profitable\/"},"author":{"name":"foundation","@id":"https:\/\/stage.buildxact.com\/us\/#\/schema\/person\/9065873438068b02441d0da8cc981fb0"},"headline":"Roofing Project Management: How to Keep Jobs on Track and Profitable","datePublished":"2026-10-13T20:18:17+00:00","mainEntityOfPage":{"@id":"https:\/\/stage.buildxact.com\/us\/blog\/roofing-project-management-how-to-keep-jobs-on-track-and-profitable\/"},"wordCount":2313,"publisher":{"@id":"https:\/\/stage.buildxact.com\/us\/#organization"},"image":{"@id":"https:\/\/stage.buildxact.com\/us\/blog\/roofing-project-management-how-to-keep-jobs-on-track-and-profitable\/#primaryimage"},"thumbnailUrl":"https:\/\/stage.buildxact.com\/us\/wp-content\/uploads\/sites\/2\/2026\/08\/Image-1-3.png","keywords":["roofing project management"],"articleSection":["Blogs"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/stage.buildxact.com\/us\/blog\/roofing-project-management-how-to-keep-jobs-on-track-and-profitable\/","url":"https:\/\/stage.buildxact.com\/us\/blog\/roofing-project-management-how-to-keep-jobs-on-track-and-profitable\/","name":"Roofing Project Management Guide for Pros | Buildxact US","isPartOf":{"@id":"https:\/\/stage.buildxact.com\/us\/#website"},"primaryImageOfPage":{"@id":"https:\/\/stage.buildxact.com\/us\/blog\/roofing-project-management-how-to-keep-jobs-on-track-and-profitable\/#primaryimage"},"image":{"@id":"https:\/\/stage.buildxact.com\/us\/blog\/roofing-project-management-how-to-keep-jobs-on-track-and-profitable\/#primaryimage"},"thumbnailUrl":"https:\/\/stage.buildxact.com\/us\/wp-content\/uploads\/sites\/2\/2026\/08\/Image-1-3.png","datePublished":"2026-10-13T20:18:17+00:00","description":"Run roofing jobs from estimate to final inspection. Schedule crews, order materials, track costs, and protect your margin on every job.","inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/stage.buildxact.com\/us\/blog\/roofing-project-management-how-to-keep-jobs-on-track-and-profitable\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/stage.buildxact.com\/us\/blog\/roofing-project-management-how-to-keep-jobs-on-track-and-profitable\/#primaryimage","url":"https:\/\/stage.buildxact.com\/us\/wp-content\/uploads\/sites\/2\/2026\/08\/Image-1-3.png","contentUrl":"https:\/\/stage.buildxact.com\/us\/wp-content\/uploads\/sites\/2\/2026\/08\/Image-1-3.png","width":1296,"height":730,"caption":"Roofing crew member on a residential job site checking a job schedule on a tablet"},{"@type":"WebSite","@id":"https:\/\/stage.buildxact.com\/us\/#website","url":"https:\/\/stage.buildxact.com\/us\/","name":"Buildxact US","description":"Estimating &amp; Job Management Software","publisher":{"@id":"https:\/\/stage.buildxact.com\/us\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/stage.buildxact.com\/us\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/stage.buildxact.com\/us\/#organization","name":"Buildxact US","url":"https:\/\/stage.buildxact.com\/us\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/stage.buildxact.com\/us\/#\/schema\/logo\/image\/","url":"https:\/\/stage.buildxact.com\/us\/wp-content\/uploads\/sites\/2\/2022\/01\/buildxact-logo.png","contentUrl":"https:\/\/stage.buildxact.com\/us\/wp-content\/uploads\/sites\/2\/2022\/01\/buildxact-logo.png","width":278,"height":68,"caption":"Buildxact US"},"image":{"@id":"https:\/\/stage.buildxact.com\/us\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/stage.buildxact.com\/us\/#\/schema\/person\/9065873438068b02441d0da8cc981fb0","name":"foundation","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/1639025117d50be7cb6f7c1370885298dc98605d2fcd9be7ba5b4ccc3fb84a5e?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/1639025117d50be7cb6f7c1370885298dc98605d2fcd9be7ba5b4ccc3fb84a5e?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/1639025117d50be7cb6f7c1370885298dc98605d2fcd9be7ba5b4ccc3fb84a5e?s=96&d=mm&r=g","caption":"foundation"},"url":"https:\/\/stage.buildxact.com\/us\/author\/foundation\/"}]}},"_links":{"self":[{"href":"https:\/\/stage.buildxact.com\/us\/wp-json\/wp\/v2\/posts\/36501","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/stage.buildxact.com\/us\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/stage.buildxact.com\/us\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/stage.buildxact.com\/us\/wp-json\/wp\/v2\/users\/55"}],"replies":[{"embeddable":true,"href":"https:\/\/stage.buildxact.com\/us\/wp-json\/wp\/v2\/comments?post=36501"}],"version-history":[{"count":1,"href":"https:\/\/stage.buildxact.com\/us\/wp-json\/wp\/v2\/posts\/36501\/revisions"}],"predecessor-version":[{"id":36734,"href":"https:\/\/stage.buildxact.com\/us\/wp-json\/wp\/v2\/posts\/36501\/revisions\/36734"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/stage.buildxact.com\/us\/wp-json\/wp\/v2\/media\/36499"}],"wp:attachment":[{"href":"https:\/\/stage.buildxact.com\/us\/wp-json\/wp\/v2\/media?parent=36501"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/stage.buildxact.com\/us\/wp-json\/wp\/v2\/categories?post=36501"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/stage.buildxact.com\/us\/wp-json\/wp\/v2\/tags?post=36501"},{"taxonomy":"contributing_author","embeddable":true,"href":"https:\/\/stage.buildxact.com\/us\/wp-json\/wp\/v2\/contributing_author?post=36501"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}